RCDs
RCD Protection at Home
An RCD (residual current device) cuts the power when current leaks to earth, through a person who touches something live or through faulty wiring. Old fuse boards have none, and a board with no RCD is one of the clearest signs the electrics need work.
What an RCD does, how to test it, and what it means when it keeps tripping.
Free, no obligation. One registered electrician prices it, not five.
- Test buttonpress it twice a year, when the clocks change
- €350 to €1,400a new board with RCD protection
- Trips for no reason?get the wiring tested
- €150 to €350an inspection and report
What it does
The switch with the test button
A fuse or a circuit breaker (MCB) protects the cable from too much current. An RCD protects people: it watches for current leaking to earth, and cuts the circuit when it does. That leak could be through someone's body, a shock risk, or through damaged wiring or an appliance, a fire risk.
On a modern board you'll see one or more switches marked with a T or a test button. Some boards have an RCBO on each circuit, which does both jobs. If there's no test button anywhere, there's no RCD.
Tripping
When the RCD keeps tripping
Unplug everything on that circuit and reset it. If it holds, plug things back one at a time: a faulty appliance, often a kettle, an oven element or an outdoor light, is a common cause. If it trips with nothing plugged in, Safe Electric's advice is to get a registered electrician to look at the installation: an RCD tripping for no clear reason can be a sign the insulation of the wiring is breaking down.
That's when a test, and a Periodic Inspection Report, earns its €150 to €350.
Services
Rewiring jobs we take requests for
Every job is done and certified by a Safe Electric registered electrician.
Full rewireEvery circuit replaced, a new board, tested and certified. €7,000 to €14,500 for a 3-bed house.More on full rewire →
Partial rewireA kitchen, an extension or a few circuits, when the rest tests sound. €1,200 to €4,000+.More on partial rewire →
Fuse board upgradeA new consumer unit with RCD protection. €350 to €1,400.More on fuse board upgrade →
Electrical inspectionA Periodic Inspection Report on every circuit. €150 to €350 for most houses.More on electrical inspection →
Rewiring an old houseRubber cable, ceramic fuses and period ceilings: what changes in an older house.More on rewiring an old house →CertYour completion certificateSafe Electric certOnly a Registered Electrical Contractor can issue it. Keep it with the deeds.More on Safe Electric cert →Counties
House rewiring in every county
One registered electrician per county. Pick yours for local housing figures, prices and the council grants.
- Carlow38% of homes built before 1981
- Cavan35% of homes built before 1981
- Clare40% of homes built before 1981
- Cork44% of homes built before 1981
- Donegal33% of homes built before 1981
- Dublin49% of homes built before 1981
- Galway33% of homes built before 1981
- Kerry40% of homes built before 1981
- Kildare29% of homes built before 1981
- Kilkenny41% of homes built before 1981
- Laois33% of homes built before 1981
- Leitrim37% of homes built before 1981
- Limerick44% of homes built before 1981
- Longford37% of homes built before 1981
- Louth42% of homes built before 1981
- Mayo39% of homes built before 1981
- Meath31% of homes built before 1981
- Monaghan43% of homes built before 1981
- Offaly42% of homes built before 1981
- Roscommon39% of homes built before 1981
- Sligo39% of homes built before 1981
- Tipperary47% of homes built before 1981
- Waterford42% of homes built before 1981
- Westmeath39% of homes built before 1981
- Wexford35% of homes built before 1981
- Wicklow42% of homes built before 1981
Guides
Rewiring guides
- House rewire costBy size of home: €7,000 to €14,500 for a 3-bed house.
- Signs you need a rewireThe warning signs, and which ones are urgent.
- Partial rewireWhen part of the house is enough: €1,200 to €4,000+.
- How long a rewire takes4 to 10 days for a 3-bed house.
- Living in the house during a rewireWhat the week is like, room by room.
- The Safe Electric certWhy only a registered electrician can sign it off.
- Electrical inspectionThe Periodic Inspection Report: €150 to €350.
- Fuse board upgradeA new consumer unit: €350 to €1,400.
Questions
Questions people ask
What does an RCD do?
It cuts the power when it detects current leaking to earth, through a person or a fault, much faster than a fuse would.
How do I know if I have an RCD?
Look at the board for a switch with a test button, often marked T. No test button, no RCD.
How often should I test my RCD?
Safe Electric's advice is at least twice a year, when the clocks change, by pressing the test button.
Why does my RCD keep tripping?
A faulty appliance, water getting into an outdoor fitting, or wiring whose insulation is breaking down. If it trips with nothing plugged in, get the wiring tested.
Can I add an RCD without a new board?
Usually the answer is a new board with RCD protection built in, which costs €350 to €1,400. The electrician tests the circuits first, because an RCD will show up any weak ones.
Find out what your rewire costs
Six taps for our price range, then a written price from one Safe Electric registered electrician who covers your county. Free, no obligation.
